Adua Engineering (Aust) Pty. Ltd. was formed in 1971 by our present Managing Director, Mr. Phil Bonanni. During the past 36 years Adua Engineering (Aust) Pty. Ltd. has operated in the field of steelwork fabrication and erection and has formed firm associations with reliable and professional sub-contractors.
All key personnel of Adua Engineering (Aust) Pty. Ltd. have been with the Company for many years, Mr. Bonanni, founder of the company has forty five years experience in our trade, Mr.Craig Hogarth (Contracts Manager) has been with us for 16 years and Alberto Bonanni, (Workshop Foreman) for 17 years. Our work force are long term employees and we enjoy excellent industrial relations.
Because of our past thirty six years in business we are well educated in Environmental Management Issues, we have an enviable Safety Management Record and have in place our Enterprise Bargaining Agreement, and Quality Assurance programme. We are Pre-Qualified with the Roads and Traffic Authority in the Complex Steelwork category.
Some of our past projects are listed below for your perusal:
2010 Novo Rail, Supply, Fabrication, Surface treatment and Delivery to Site of Trough Box Girders Total Weight 230 Tonnes. AS/NZS 1554.1
2010 RailCorp, Supply, Fabrication, Surface treatment and Delivery to Site of Trough Box Girders Total Weight 109 Tonnes. AS/NZS 1554.5
2009 REED Constructions, Supply, Fabrication, Surface treatment and Delivery to Site of Falcon Street Pedestrian Bridge 6 Girders Total Weight 263 Tonnes.
2009 Westgate Freeway Alliance, Supply Fabrication, Surface treatment and Delivery to Melbourne of Bridge 203 160 Tonnes.
2008 Westgate Freeway Alliance, Supply, Fabrication, Surface treatment and Delivery to Melbourne of Bridge 102 600 Tonnes.
2008 REED Constructions, Supply, Fabrication, Surface treatment and Delivery to Wollongong of Infra 3 Pedestrian Bridge.
2008 Abergeldie, Supply, Fabrication, Surface treatment and Delivery to Blue Mountains of the Skywalk Pedestrian Bridge.
2008 R.T.A. Douglas Park Bridge Repair.
2007 Thiess John
Holland, Supply, Fabrication, Surface treatment and Delivery of Springvale Bridge to Melbourne Eastlink 150 Tonne.
2006 Thiess John
Holland, Supply, Fabrication, Surface treatment and Delivery of Bridge 84 Eastlink Melbourne 400 Tonne.
2005 Leighton Contractors, Supply, Fabrication, Surface treatment and Delivery of the
Bus Transit Way,
Cumberland Rd Bridge 600.
2004 Rail Corporation, Fabrication, Surface treatment, Trial Assembly, Delivery and Erection of two bridges 260 Tonne.
2004 ABIGroup Leighton Joint Venture Supply, Fabrication, Protective Treatment, Delivery and Erection of Toll Gantries for the M7.
2004
BHBBCrossCity Tunnel Joint Venture Supply, Fabrication, Protective Treatment and Delivery of Bridge Girders and Structural Steel.
2003
BHBBCrossCity Tunnel Joint Venture Supply, Fabrication, Protective Treatment and Delivery of Headstocks and Bridge Girders for Market St Viaducts.
2003 Waterway Constructions Pty Ltd Supply, Fabrication, Protective Treatment and Delivery of Steelwork for Walsh
Bay Shore Studios 2/3
2003 Leighton Contractors Pty Ltd. Supply, Fabrication, Protective Treatment, Delivery and Erection of internal structural steelwork for the Hilton.
2002 Transfield Pty. Ltd. / Roads and Traffic Authority - Supply, Fabrication, Protective Treatment and Delivery of steelwork for the Widening of the
WesternDistributorHarbourBridge.
2001 Leighton Contractors - Supply, Fabrication, Delivery and Erection of Steelwork for the
St.VincentsHospital extension project.
2001 Rolls Royce Australia Ltd. - Supply, Fabrication, and Delivery of steelwork for the Tarong North Power Station.
2000 Hornsby Shopping Centre - Supply, Fabrication, Protective Treatment, Delivery and erection of steelwork for Zone F Shopping Centre, for Westfield Design & Construction.
2000 Two Submerged Chain Conveyors - supply, fabrication, protective treatment and delivery of Submerged Chain Conveyors for Rolls Royce Australia Ltd.
1999 Equestrian Centre, supply, fabrication, protective treatment and erection of steelwork for Equestrian Centre for Lipmans Pty. Ltd.
1999 Northern Water Feature - Supply, Fabrication and erection of steelwork for Abigroup Contractors - Homebush Bay Northern Water Feature.
1998 Roberts Road Viaduct - Supply, Fabrication, protective treatment of steelwork for Bridge over Roberts Road Chullora for Abigroup Contractors.
1998 Wambo Dump Hoppers, Supply, fabrication, protective treatment and erection of steelwork for Dump Hoppers at Wambo Mine for Abigroup Contractors.
1998 Nepean Hospital Extension Stage 2, Supply, fabrication and protective treatment and erection of steelwork for Extension of Nepean Hospital.
1997 Sydney Indoor Sports Centre, Supply, fabrication, protective treatment and erection of steelwork for Sports Centre, Homebush for Cordukes Ltd.
1997 Submerged Scraper Conveyors, Supply, fabrication and protective treatment and deliver Submerged Scraper Conveyors - for John Thompson Aust Pty. Ltd.
1996 Supply, Fabrication, Protective Treatment, Delivery and Erection of Steelwork for Extensions and Additional seven floors to
347 Kent Street,
Sydney for Baulderstone Hornibrook Pty. Ltd.
1996 Supply, Fabrication, Protective Treatment, Delivery and Erection of Steelwork for Extensions and Improvements to
Parramatta Railway Station for the AbiGroup Pty. Ltd.
1995 Supply, Fabrication, Protective Treatment, Delivery and Erection of Steelwork for Pyrmont Sub Station for Baulderstone Hornibrook Pty. Ltd.
1995 Supply, Fabrication, Protective Treatment, Delivery and Erection of Steelwork for
KooragangIsland Rail Receival for Baulderstone Hornibrook Pty. Ltd.
1994 Supply, Fabrication, Protective Treatment, Delivery and Erection of Steelwork for Pilkingtons Glass Factory Extension for Baulderstone Hornibrook Pty. Ltd.
1994 Supply, Fabrication, Protective Treatment, Delivery and Erection of Steelwork for
Cathay Pacific Data Centre for Civil & Civic Pty. Ltd.
1994 Supply, Fabrication, Protective Treatment, Delivery and Erection of Steelwork for Woolworths Marketplace, Plumpton for Uniscan Pty. Ltd.
1993 Supply, Fabrication, Protective Treatment, Delivery and Erection of Steelwork for Australian Taxation Office for Baulderstone Hornibrook Pty. Ltd.
1993 Supply, Fabrication, Protective Treatment, Delivery and Erection of Steelwork ACI Glass Factory Extension, for Baulderstone Hornibrook Pty. Ltd.
QUALITY ASSURANCE DETAILS
Adua Engineering (Aust) Pty. Ltd. has established an integrated system based on ISO 9004, AS4804, ISO 14000. Our system is based on ISO 9002:1994 with management systems, manual, procedures and instructions. (Manual to be reviewed to update to ISO9004/2000) when issued.
OCCUPATIONAL HEALTH, SAFETY & RE HABILITATION
Based on AS 4804 and OHS Act No. 20, 1983 as amended WTIA Tech Note 7, Implemented Safe Operating Procedures and Instructions. Certified (By Work cover) Rehabilitation Officer. Delegated Safety Officer, Delegated Site Safety Officer.
ENVIRONMENTAL MANAGEMENT SYSTEM DETAILS
Adua Engineering (Aust) Pty. Ltd. have implemented E.M.S. procedures with operations continually being reviewed and corrective procedures put into place as required.
We look forward to the opportunity to work for you, we would be pleased to show you around our workshop at any time to suit your convenience, Please do not hesitate to contact the undersigned if we can assist you.